![]() |
| (From the Des Moines Register. November 6, 1927) |
The plant was designed by Proudfoot, Rawson & Souers, with Professor B. P. Fleming serving as consulting engineer. The total projected cost was $500,000.
![]() |
| (From the Des Moines Register. November 6, 1927) |
The plant was designed by Proudfoot, Rawson & Souers, with Professor B. P. Fleming serving as consulting engineer. The total projected cost was $500,000.